Between Tuesday, June 7 to Thursday, June 30, there will be a two-inch hose running through parts of TVA. The hose carries grout from the batch plant to the injection grout drill rig for the process of installing new sewer manholes. The line will run through TVA from the fenced-off drill rig located just above the TVA F building, down and around the parking lot by the TVA C building, and then down to the current pump house and concrete silo located near the parking lot by the Multipurpose Center.
Small ramps will be placed where any hose crosses over walkways and sidewalks to allow pedestrians to walk over.